This project involved the execution of an emergency shoreline protection project at the Sand Pebbles Inn in Qualicum Beach, completed in December 2022. Following a severe storm that caused the collapse of an existing concrete wall, our team mobilized quickly to stabilize the area. The work included the installation of a rock revetment using large, angular blast rock to absorb wave energy and reinforce the coastline. This action successfully restored stability and created a durable barrier to safeguard the property from future storm impacts.

PROJECT KEY FEATURES

  • Emergency Response and Site Stabilization
  • Rock Revetment Installation
  • Shoreline Protection and Restoration

PROJECT VALUE

$100,000