This project involved the construction of a new parking lot for the Snuneymuxw First Nation (SFN), completed in November 2023. The work required comprehensive site preparation, including grading and leveling, to create a stable foundation. The project’s scope also included the installation of a proper storm drainage system, along with the setup of light bases and poles for safety and accessibility. Perimeter fencing was also installed to secure the area, resulting in a durable and functional parking facility.

PROJECT KEY FEATURES

  • Storm Drainage Installation
  • Lighting Infrastructure (Bases & Poles)
  • Site Grading and Preparation
  • Perimeter Fencing

PROJECT VALUE

$220,000